Maintenance & Reliability
HP Reliability: Consider bidirectional flow devices for mechanical seals
Many dual mechanical seals found in centrifugal pumps use either pumping rings or pumping screws to move barrier fluid. Typical flowrates achieved with pumping rings are extremely low, with most of th..
Case 30: One cause of a pump not pumping
A stronger pump can block out the weaker one
Update design and maintenance methods for refractory systems
Better design methods and repair efforts reduce failure of these systems
Improve asset performance management
This methanol plant implemented a system that supported its strategic objectives of managing risk and improving profitability
HP Reliability: Don't just repair: Upgrade!
 Fig. 1     Bearing mounting options. A well-known trade journal recently published a page on thrust-bearing orientation..
HP Reliability: Filtration and beta ratios
Effective filtration of lubrication and hydraulic systems is of real importance to the reliability professional. The general idea is to allow no particles larger than the clearances in system componen..
Effect of process deposits on the corrosion behavior of titanium in brine
The temperature and pH need to be controlled to avoid problems
Case 29: Pressure buildup in a 'blocked-in' pipe
Liquid thermal expansion can rupture pipes
Consider an advanced method of steam trap condition monitoring
HEINZ P. BLOCH, RELIABILITY/ EQUIPMENT EDITOR Comments? Write: HB@HydrocarbonProcessing.com ..
HP Reliability: Unreliability, engineers and lawyers
I have often engaged in litigation support. To me, litigation support is a term meaning one might occasionally choose to work for law firms that pay engineers to relate how and why machines function a..
- NAPCOR releases 2024 PET recycling report highlighting system efficiency gains and continued strength of PET circularity 12/12
- OQ courts other partners for petrochemical complex in Oman as SABIC drops out 12/12
- Brazil's BNDES approves $71 MM for carbon storage project 12/12
- Cuba on edge as U.S. seizure of oil tanker puts supply at risk 12/12
- China oil demand to plateau between 2025 and 2030 12/12
- Germany's PCK refinery says no impact from pipeline leak 12/12

