Automation
Digital Feature: Enhancing ethylene cracker radiant tube integrity through innovative robotic inspection
Analyzers
/ Automation
/ Corrosion
/ Engineering & Design
/ Equipment
/ Environment & Safety
/ Ethylene
/ Furnaces
/ Heat Transfer
/ Loss Prevention
/ Instrumentation
/ Petrochemicals
/ Process Optimization
/ Safety
/ Sensors
Radiant tube failure ranks as a primary cause of unplanned shutdowns in ethylene cracking furnaces. This article examines tube failures via carburization, along with a proprietary technology that provides comprehensive multi-aspect inspection data to mitigate ethylene radiant tube failures.
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Vyterra Renewables receives funding to advance its Nova Scotia low-carbon fuel oil project 3/26
- BASF inaugurates €8.7-B Verbund site in Zhanjiang, China 3/26
- Partners sought from construction and engineering for program to decarbonize £1 T/yr global market for low-carbon jet fuel 3/26
- OCI Global completes handover of Beaumont New Ammonia to Woodside 3/26
- Iran war chokes petrochemical supply, sends plastic prices soaring 3/26
- Russia's vast Kirishi oil refinery halts operations after drone attacks 3/26
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

