Test run with sales gas feed in a traditional H2 plant
            A conventional hydrogen (H2) plant in a Middle Eastern refinery was designed to produce 75,000 normal cubed meters per hour (Mnm3/hr) of H2 product with 95% purity with plat offgas feed (platformer offgas mixed with hydrocracker offgas).
            
            
            IP: 10.1.65.187
            This is a preview of our premium content. Thank you for your interest—please 
log in or 
subscribe to read the full article.
 
            
            
    
            The Authors
    
    
                
                    
                        Yeh, G. J. - Saudi Aramco, Saudi Arabia
                        
                            is a registered professional engineer in the state of Louisiana with 26 years of experience in oil refining, catalyst manufacturing and within the research and development environment. Dr. Yeh is currently working as an engineering specialist in the Process & Control Systems department of Saudi Aramco in Dhahran, Saudi Arabia, supporting areas that include catalyst and adsorbent selection, hydrogen plant, hydroprocessing and naphtha reforming. He holds a BS degree in chemical engineering and an ME degree and PhD in chemical and fuels engineering.
                        
                     
                 
                
                    
                        Al-Malki, M. A. - Saudi Aramco, Riyadh, Saudi Arabia
                        
                            is a process engineer for Saudi Aramco and the supervisor of planning and accountability units, where he is in charge of leading a group of professionals to prepare business plans, monitor key performance indicators (KPIs) and evaluate and control fiscal performance. Mr. Al-Malki has been in the oil refining business for 10 years, working in different processing units, including hydrocracking, hydroprocessing and reforming. As a planning engineer, he has also been responsible for evaluating operation levels and production targets. Mr. Al-Malki holds a BS degree in chemical engineering.
                        
                     
                 
       
     
            
            
    From the Archive
    
            
         
        
        
    
    Current Digital Edition
    
Sign up to Receive Our Newsletter
    Latest News
    
    
	Construction Boxscore: Project Spotlight
	
		Project:
		Long Son Petrochemicals Complex
		Location:
		Long Son, Vietnam
		Operator:
		Siam Cement Group
		Cost:
		$5.4 B
		Capacity:
		1.65 MMtpy
		Completion date:
		2023
		Status:
		Under Construction
	
	 
 
    
         
        
     
        
Comments