Allan, D.
David Allan is a Process Control Engineer at Woodside Energy Ltd. He has 10 yr of experience in the oil and gas industry and 3 yr of experience as a process control engineer. He earned a BE degree in chemical and process engineering from the University of Western Australia.
Case study: Gas turbine generator fleet optimization
Cost reduction has always been an important focus for industrial plants to improve their bottom lines.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Digital Exclusive: Bio-based aromatics give pathway to drop-in 100% SAF 12/4
- Digital Feature: Enhancing ethylene cracker radiant tube integrity through innovative robotic inspection 12/4
- Suez Canal and Scatec sign $1.1-B green methanol MoU 12/4
- Kuwait's al-Zour refinery now fully operational 12/4
- Petroecuador says crude oil output surpasses 400,000 bpd 12/4
- Russia's seaborne diesel exports rose in November with the ban lifted and increased production 12/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction