Gil, A.
Antonia Gil is a senior lecturer (Associate Professor) at the University of Zaragoza. Her fields of expertise are thermodynamics, heat transfer, thermal engineering and energy from biomass. At present, she conducts research activities as a member of the CIRCE Institute (University of Zaragoza). She has lead and/or participated in several Spanish and EU research projects over the past 20 yr.
Improving resource efficiency of industrial processes with the TOP-REF methodology—Part 2
Europe
/ Environment & Safety
/ Construction
/ Petrochemicals
/ Process Optimization
/ Refining
/ Engineering & Design
/ Environment
/ Economics
The European TOP-REF research consortium has developed and applied a methodology to improve the resource efficiency of industrial production processes.
Improving resource efficiency of industrial processes with TOP-REF methodology—Part 1
Europe
/ Analyzers
/ Carbon Management
/ Construction
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Environment & Safety
/ Maintenance & Reliability
/ Petrochemicals
/ Greenhouse Gases
/ Information Systems
/ Loss Prevention
/ Management
/ Products
/ Process Optimization
/ Refining
The processing industry consumes significant amounts of resources, such as materials and energy, to produce valuable goods for society.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- China's March jet fuel exports jump 77.4% from a year earlier 4/18
- Nigeria strikes deal with Shell to supply $3.8-B methanol project 4/18
- Singapore fuel oil stockpiles rebound to 8-week high on higher imports 4/18
- Clariant launches new CATOFIN 312 propane dehydrogenation catalyst 4/18
- Solvay inaugurates new blowing agent production unit in Rosignano, Italy 4/18
- Meridian Energy Group’s Davis Refinery Project in North Dakota (U.S.) will be the world’s first net-zero carbon refinery 4/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction