Sayan, H.
Hale Sayan is a Process and Equipment Development Superintendent at Tüpraş headquarters. Her refining experience includes process simulation, equipment design, process engineering for crude and vacuum units and various revamp projects. She holds a BS degree in chemical engineering from Middle East Technical University.
Processing hydrogen-rich gas in a PSA unit
At Tüpraş’ Kırıkkale refinery, adsorbents in pressure-swing adsorption (PSA) units must be reloaded due to the low hydrogen (H2) recovery and low capacity factor of such units.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Lummus Technology completes acquisition of NAPCON from Neste, expanding digital and AI capabilities 6/2
- IATA expects sustainable aviation fuel production to double in 2025 6/2
- RIC Energy and Siemens to jointly develop renewable H2, green ammonia and eFuels 6/2
- Trump administration (U.S.) axes $3.7-B in green energy projects 6/2
- European chemical industry pessimistic for 2025, recovery not until 2026 says new report 6/2
- U.S. ethanol output eases off record pace as summer travels heat up 6/2
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction