Bilgi, M. Z.
Mehmet Zaki Bilgi is a Hydroprocessing Engineer at Tüpraş, responsible for the hydrogen production and hydrocracking units at the Kırıkkale refinery. He graduated from Middle East Technical University.
Processing hydrogen-rich gas in a PSA unit
At Tüpraş’ Kırıkkale refinery, adsorbents in pressure-swing adsorption (PSA) units must be reloaded due to the low hydrogen (H2) recovery and low capacity factor of such units.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Ineos to shut polystyrene facility in Illinois (U.S.) by the end of the year 6/19
- How ASTM approval of methanol-to-jet accelerates SAF at scale 6/19
- Digital Exclusive: Water injection pump mechanical seals failure after pump shutdown 6/19
- Russian gasoline output down 25% so far in June after drone attacks on refineries 6/19
- Iraq to export crude, naphtha through Syria after Hormuz shock 6/19
- Majority of Iranian petrochemical units back to production 6/19
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

