Reyhan Dinçer, A.
Asli Reyhan Dinçer is Simulation Superintendent at Tüpraş headquarters. She previously worked as a process engineer at Foster Wheeler. She holds a BSc degree in chemical engineering from Yıldız Technical University.
Optimization study in hydrocracker unit using simulation model
Process Optimization
/ Refining
/ Economics
/ Hydrocracking
/ Information Systems
/ Europe
/ Asia/Pacific
/ Middle East
Hydrocrackers are key refinery units that convert heavy feed components into valuable lighter products. The profitability of these units is directly related to this conversion level. Conversion reactions take place in a nearly pure hydrogen environment, with the help of selective catalysts, under high pressure and high temperature. The products of the unit are separated in the fractionator section. Unconverted oil taken from the fractionator bottoms reveals the conversion performance of the unit.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- MOL inaugurated its €1.3-B, 200,000-tpy polyol complex in Tiszaújváros, Hungary 5/15
- China's CNCEC to build 300,000-bpd Al-Faw refinery in Iraq 5/15
- Itochu to buy green ammonia from HIVE's $5.9-B Coega facility 5/15
- Higher refinery costs could increase summer gasoline prices says US EIA 5/15
- Nextchem completes acquisition of GasConTec, adding new low-carbon hydrogen/methanol to portfolio 5/15
- Govt.-backed Chinese refiner seeks oil import quota after restructuring 5/15
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction