Reyhan Dinçer, A.
Asli Reyhan Dinçer is Simulation Superintendent at Tüpraş headquarters. She previously worked as a process engineer at Foster Wheeler. She holds a BSc degree in chemical engineering from Yıldız Technical University.
Optimization study in hydrocracker unit using simulation model
Process Optimization
/ Refining
/ Economics
/ Hydrocracking
/ Information Systems
/ Europe
/ Asia/Pacific
/ Middle East
Hydrocrackers are key refinery units that convert heavy feed components into valuable lighter products. The profitability of these units is directly related to this conversion level. Conversion reactions take place in a nearly pure hydrogen environment, with the help of selective catalysts, under high pressure and high temperature. The products of the unit are separated in the fractionator section. Unconverted oil taken from the fractionator bottoms reveals the conversion performance of the unit.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- YPF, Eni and XRG sign joint development agreement advancing 12-MMtpy Argentina LNG project 2/12
- Maire launches new technology to produce PTMEG, the key polymer composing the spandex fiber. 2/12
- Verde Clean Fuels announces suspension of development of Permian Basin gas-to-gasoline project 2/12
- Vietnam's largest refinery to operate at 120%-125% of designed capacity in Q1 2/12
- Indonesia's Medco expansion plans bet on rising energy demand in Southeast Asia 2/12
- Brazil to rebuild ethanol stocks in new harvest after 21% drop in 2025-2026 2/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

