Sivaraman, S.
Estimating tank calibration uncertainty
Use these calculations for a specific tank calibration
Determine 'unknown loss' in refineries and terminals
Use the systematic error component of a measuring device to correct mass/ volume balances
Determining system capability for loss control and custody transfers
The key is a planned evaluation of the measurement systems and procedures
Tank gauging or metering: guidelines for selection
Here are the deciding factors for custody transfer applications
Standardizing emerging metering and electronics technologies
Use these guidelines for testing and analyzing new technologies for custody transfer applications
Use ATG for tank-based custody transfers
The technology is now accurate and reliable enough for these applications
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- IRPC extends abstracts deadline following strong industry interest 4/7
- BDI signs contract with Ghent Renewables for the construction of a new biofuel feedstock pre-treatment plant 4/7
- Update: IATA airlines chief warns aviation industry falling behind on net-zero 4/7
- Improved recycling of plastic from packaging waste 4/7
- India not to raise petrol, diesel retail prices despite tax hike 4/7
- China teapot oil refiners improve run rates but demand woes, sanctions weigh 4/7
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction