Sivaraman, S.
Estimating tank calibration uncertainty
Use these calculations for a specific tank calibration
Determine 'unknown loss' in refineries and terminals
Use the systematic error component of a measuring device to correct mass/ volume balances
Determining system capability for loss control and custody transfers
The key is a planned evaluation of the measurement systems and procedures
Tank gauging or metering: guidelines for selection
Here are the deciding factors for custody transfer applications
Standardizing emerging metering and electronics technologies
Use these guidelines for testing and analyzing new technologies for custody transfer applications
Use ATG for tank-based custody transfers
The technology is now accurate and reliable enough for these applications
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ExxonMobil plans 1 Blbs/yr of advanced recycling by 2027 11/22
- Gauging the likely Trump effect on U.S. energy and power sectors 11/22
- Russia's Lukoil restoring cracker at NORSI refinery, gasoline output rising 11/22
- Nigeria's local currency crude sales fall short of target, Dangote refinery says 11/22
- U.S. October gasoline imports hit post-pandemic low on slump in European shipments 11/22
- Clean Hydrogen Works awards McDermott FEED contract for Ascension Clean Energy (ACE) project 11/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction