Singh, D.
Meeting diesel specifications at sustained production
Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Biofuels
/ Cetane
/ Construction
/ Crude oil
/ Desulfurization
/ Diesel
/ Distillation
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Furnaces
/ Gasification
/ Gasoline
/ Heat Transfer
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Middle East
/ Octane
/ Reactors
New approach rethinks operations of crude and vacuum distillation units to recover more distillate
Redesign crude preheater train for efficiency
Over design of heat exchangers sourced to fouling problems
Improve natural gas liquids recovery
Designing for temperature variations does impact operating costs and unit efficiencies
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Topsoe to support green ammonia flagship project in Saudi Arabia 1/27
- Asahi Kasei, Mitsui Chemicals and Mitsubishi Chemical establish entity for ethylene plant decarbonization 1/27
- Neste supports catalysis research at three universities in Finland 1/27
- Haffner Energy launches the C-iC modular units line to unlock financing for mid-sized biofuel projects 1/27
- Repsol to install second 100-MW electrolyzer at its Petronor refinery 1/27
- Toshiba and Airbus drive the future of hydrogen-powered flight with superconducting motors 1/27
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

