In case history, engineers search for root cause of water-side tube failures for a 23-year-old boiler
Flow-induced fatigue failure
Case histories describe a variety of failures and solutions
Failure analysis of above-ground storage tank bottom plates
Here are the field performance assessments and remedial measures
Effect of process deposits on the corrosion behavior of titanium in brine
The temperature and pH need to be controlled to avoid problems
Failure analysis of a primary reformer riser
Investigation revealed the root cause was creep rupture
Top of line corrosion in industrial wastewater pipelines
Here are the causes and the solution
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Singapore distillates stocks slip to below 9 MMbbl 10/25
- Valero CEO says 'all options are on the table' for two California refineries 10/25
- Oil exports from Russia's western ports to fall 13% in Nov. as refinery maintenance ends 10/25
- Iraq's Kerbala refinery to operate at 50% in coming days 10/25
- BASF invests in increasing production capacity of NeoporĀ® at Ludwigshafen site 10/24
- Vopak Energy Park Antwerp starts market consultation for ammonia storage 10/24
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction