Schabort, C. J.
Update temperature control for a Claus unit with neural networks
Environment & Safety
/ Process Control
/ Process Optimization
/ Refining
/ Acid Gas Removal
/ Americas
/ Asia/Pacific
/ Construction
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Gasoline
/ Greenhouse Gases
/ Heat Transfer
/ Information Systems
/ Loss Prevention
/ Middle East
/ Reactors
/ Safety
The Natref oil refinery in Sasolburg, South Africa, had experienced refractory problems in the sulfur recovery unit’s (SRU’s) combustion chamber since startup (Fig. 1). Even though the SRU w..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Sealmatic partners with Saudi Thalate in Saudi Arabia 10/14
- Colonial Oil Industries Marine Division achieves ISCC Plus and EU certifications 10/14
- Fulkrum diversifies its service portfolio with new offerings 10/14
- Kinaxis, ExxonMobil partner to transform energy sector supply chains 10/14
- Phillips 66 agrees to sell interest in Switzerland-based joint venture 10/14
- Nigeria signs deal to supply gas to proposed $3.5-B petrochemical plant 10/14
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction