Xu, Q.
Consider novel CGC and front-end depropanizer system for olefins production
Petrochemicals
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Boilers
/ Compressors
/ Construction
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Furnaces
/ Heat Transfer
/ Middle East
/ Naphtha
/ Polymers
/ Reactors
In the presented case study, an innovative design for an integrated CGC-DeC3 system introduces part of the heavier condensate from the early compression stages directly into the high-pressure (HP) depropanizer.
Operational optimization for mixed-refrigerant systems
Use rigorous simulation to improve process efficiency
Fine-tune ethylene unit startups
Petrochemicals
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Compressors
/ Construction
/ Engineering & Design
/ Europe
/ Middle East
/ Rotating Equipment
Advanced modeling methods provide useful information on operating main compressor system and feeds
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- U.S. oil, biofuel group recommends 5.25 Bgal in biomass diesel mandates 4/11
- Ukraine will add bioethanol to petrol from May, seeks first imports from EU 4/11
- UN shipping agency strikes deal on fuel emissions, CO2 fees 4/11
- S&P analysis: Global refined product demand growth likely to weaken, absolute decline cannot be ruled out 4/11
- U.S. targets China oil storage terminal in new Iran-related sanctions 4/11
- Russia's Novatek plans condensate processing complex in Murmansk 4/11
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction