Stavrakas, D.
Use dynamic simulation for advanced LNG plant design
Gas Processing/LNG
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Europe
/ Gasification
/ Middle East
/ Natural Gas
The work performed for the project shows that dynamic simulation can be an excellent tool for the support and verification of process design during the engineering, procurement and plant construction (EPC) stages.
Optimize training using a high-fidelity simulator
Here are lessons learned from a Russian methanol plant
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- U.S. firms to develop Syria energy masterplan after Trump lifts sanctions 7/18
- Russian seaborne diesel exports for July 1–15 fall 6% month-on-month 7/18
- INEOS invests £30 MM to slash emissions at Hull site by 75% 7/18
- Mitsubishi Chemical Group invests in Licella Holdings, oil conversion technology using supercritical water 7/18
- BASF and Equinor sign 10-yr natural gas supply agreement 7/18
- Oil prices rise after new EU sanctions on Russia 7/18
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction