Stavrakas, D.
Use dynamic simulation for advanced LNG plant design
Gas Processing/LNG
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Europe
/ Gasification
/ Middle East
/ Natural Gas
The work performed for the project shows that dynamic simulation can be an excellent tool for the support and verification of process design during the engineering, procurement and plant construction (EPC) stages.
Optimize training using a high-fidelity simulator
Here are lessons learned from a Russian methanol plant
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- China-U.S. trade war redrawing global LPG trading, outlook 4/21
- Kazakhstan raises gasoline exports plans to 54,283 tons in April 4/21
- JGC, Amogy partner to accelerate large-scale ammonia cracking technology 4/21
- Azerbaijan's SOCAR resumes operations at Baku oil refinery 4/21
- Phillips 66 fires back at Elliott over Citgo conflict of interest amid board fight 4/21
- Indonesia ships 2.02 MMt of crude, refined palm oil in March 4/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction