Sood, A.
Use dynamic simulation for advanced LNG plant design
Gas Processing/LNG
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Europe
/ Gasification
/ Middle East
/ Natural Gas
The work performed for the project shows that dynamic simulation can be an excellent tool for the support and verification of process design during the engineering, procurement and plant construction (EPC) stages.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Petroecuador declares emergency at Ecuador's biggest refinery after fire damages 5/30
- U.S. administration considers plan to clear record backlog of small refinery biofuel waivers 5/30
- Sinopec sets up $690-MM hydrogen-energy-focused venture capital fund 5/30
- Wartsila bets flexibility key for ethanol power generation in Brazil 5/30
- Lotte Chemical Titan signs contract to buy naphtha from Aramco Trading Singapore 5/30
- India's May diesel exports to Southeast Asia seen at multi-year highs on higher margins 5/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction