Harismiadis, V. I.
Use dynamic simulation for advanced LNG plant design
Gas Processing/LNG
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Engineering & Design
/ Europe
/ Gasification
/ Middle East
/ Natural Gas
The work performed for the project shows that dynamic simulation can be an excellent tool for the support and verification of process design during the engineering, procurement and plant construction (EPC) stages.
Optimize training using a high-fidelity simulator
Here are lessons learned from a Russian methanol plant
Fine-tune diesel hydrotreating operations
Environment & Safety
/ Process Control
/ Refining
/ Americas
/ Asia/Pacific
/ Europe
/ Hydrotreating
/ Middle East
/ Safety
This refinery used a simulator to train operators effectively
Optimize plant performance using dynamic simulation
This plant case history illustrates the benefits
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Sumitomo Chemical achieves scale-up of its process for producing propylene directly from ethanol 8/20
- EcoCortec, Jakob Schober GmbH awarded sustainability award for closed-loop circular films solution 8/20
- Sanctions-hit Indian refiner Nayara turns to ‘dark fleet’ 8/20
- EIA: Crude and gasoline inventories fall, distillates rise 8/20
- Czech refinery outage forces Orlen Unipetrol to seek state help to meet diesel demand 8/20
- China’s Sinopec Shanghai Petrochemical first half profit slides 8/20
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction