Taylor, A.
Andrew Taylor is a Director/Principal Consultant at Greenfern Dynamics. He has 30 yr of experience with APC in various industries, including oil refining, LNG production, oil and gas, chemical production and minerals processing. He earned a BE degree in engineering science from the University of Auckland and is a chartered professional member of Engineers Australia.
Boil-off gas APC exceeds expectations
Gas Processing/LNG
/ Process Control
/ Process Optimization
/ Analyzers
/ Engineering & Design
/ Equipment
/ Information Systems
/ Loss Prevention
/ Natural Gas
/ Asia/Pacific
The use of advanced process control (APC) technology on LNG liquefaction trains is well accepted with some of the earliest implementations developed in the late 1990s.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ADNOC, AIQ developing first-of-a-kind agentic AI solution for global energy transformation 11/4
- SEEC to use thyssenkrupp nucera’s electrolyzer for caustic soda production 11/4
- Oman's OQ to list up to 49% stake in methanol, ammonia and LPG arm 11/4
- U.S. exports of ethane and ethane-based petrochemicals rose 135% from 2014 to 2023 11/4
- Cannon Artes breaks ground on massive industrial wastewater treatment/water reuse plant in Qatar 11/4
- LyondellBasell to close Houston refinery (U.S.) in Q1 2025 11/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction