N. R. Srinath has more than 14 yr of experience in the design and engineering of heat transfer equipment in the energy and chemical sectors. He began his career with Foster Wheeler India in 2007 and has worked at Fluor New Delhi since 2013.
Case study: Challenges in the selection of a helical baffled exchanger
In a greenfield project, a proprietary heat exchanger<sup>a</sup> has been found to be preferable to conventional shell-and-tube (S&T) exchangers to optimize the total lifecycle cost (i.e., capital, operating, installation and maintenance costs).
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- YPF, Eni and XRG sign joint development agreement advancing 12-MMtpy Argentina LNG project 2/12
- Maire launches new technology to produce PTMEG, the key polymer composing the spandex fiber. 2/12
- Verde Clean Fuels announces suspension of development of Permian Basin gas-to-gasoline project 2/12
- Vietnam's largest refinery to operate at 120%-125% of designed capacity in Q1 2/12
- Indonesia's Medco expansion plans bet on rising energy demand in Southeast Asia 2/12
- Brazil to rebuild ethanol stocks in new harvest after 21% drop in 2025-2026 2/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction