Srinath, N. R.
N. R. Srinath has more than 14 yr of experience in the design and engineering of heat transfer equipment in the energy and chemical sectors. He began his career with Foster Wheeler India in 2007 and has worked at Fluor New Delhi since 2013.
Case study: Challenges in the selection of a helical baffled exchanger
In a greenfield project, a proprietary heat exchanger<sup>a</sup> has been found to be preferable to conventional shell-and-tube (S&T) exchangers to optimize the total lifecycle cost (i.e., capital, operating, installation and maintenance costs).
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ADNOC, AIQ developing first-of-a-kind agentic AI solution for global energy transformation 11/4
- SEEC to use thyssenkrupp nucera’s electrolyzer for caustic soda production 11/4
- Oman's OQ to list up to 49% stake in methanol, ammonia and LPG arm 11/4
- U.S. exports of ethane and ethane-based petrochemicals rose 135% from 2014 to 2023 11/4
- Cannon Artes breaks ground on massive industrial wastewater treatment/water reuse plant in Qatar 11/4
- LyondellBasell to close Houston refinery (U.S.) in Q1 2025 11/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction