A good simulation model is a tool that reveals critical operating conditions and can be applied to daily operations
Products yield and specifications with energy conservation goals can determine options to revamp distillation units
Debottlenecking towers involves close review of product yields while reducing tray flooding and energy consumption
Strategic location of the preflash drum not only resolves network problems, but, in some cases, reduces operating costs
Heat transfer and hydraulic problems need to be considered simultaneously