Yahyaabadi, R.
Consider practical conditions for vacuum unit modeling
A good simulation model is a tool that reveals critical operating conditions and can be applied to daily operations
Improve design strategies for refinery vacuum towers
Products yield and specifications with energy conservation goals can determine options to revamp distillation units
Increase distillation capacity with side heaters and coolers
Debottlenecking towers involves close review of product yields while reducing tray flooding and energy consumption
Rethink placement of preflash drum in crude preheat train network
Strategic location of the preflash drum not only resolves network problems, but, in some cases, reduces operating costs
Solving hydraulic problems in crude preheat train networks
Heat transfer and hydraulic problems need to be considered simultaneously
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- SABIC opens ULTEMâ„¢ resin manufacturing facility in Singapore 11/8
- U.S. refiners hold output at high levels as fuel inventories sag 11/8
- Catalyxx secures $5.8-MM Series A equity round to advance green chemistry technology 11/8
- Neste changes its guidance due to unplanned shutdown of Rotterdam refinery 11/8
- Repsol launches Nexa, the commercial brand of its 100% renewable premium diesel in service stations 11/8
- Opinion: Trump-led oil and gas export boom may go bust in Europe trade spat 11/8
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction