Beebe, D.
Dustin Beebe is the Vice President of Performance Software for Emerson. He is responsible for aligning the global control performance, operator performance and simulation businesses and the strategy synergy between Emerson and AspenTech. Before joining Emerson, Beebe served as the President of ProSys until Emerson acquired it in 2018. He has been in the industrial automation business since 1996. Beebe earned a BS degree in chemical engineering from the University of Arkansas in Fayetteville, Arkansas.
Don’t just survive: Thrive with advanced process control
Environment & Safety
/ Process Control
/ Process Optimization
/ Construction
/ Engineering & Design
/ Equipment
/ Information Systems
/ Loss Prevention
There is a new adage in process manufacturing circles, and it resonates particularly deeply in the hydrocarbon industry: If you do not like market factors today, just wait a month.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Vertex Energy pauses renewable diesel output to switch back to fossil fuels, citing macroeconomic woes 5/10
- Citgo Petroleum reports Q1 profit of $410 MM 5/10
- Golden Pass LNG in discussions with contractor, may delay startup 5/10
- SAFFiRE Renewables biofuel pilot plant to be developed in Kansas 5/10
- EBRD backs Ukraine's green biofuels project with €60-MM loan 5/10
- Russia's refined oil product exports to Singapore to hit highest this year in May 5/10
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction