Beebe, D.
Dustin Beebe is the Vice President of Performance Software for Emerson. He is responsible for aligning the global control performance, operator performance and simulation businesses and the strategy synergy between Emerson and AspenTech. Before joining Emerson, Beebe served as the President of ProSys until Emerson acquired it in 2018. He has been in the industrial automation business since 1996. Beebe earned a BS degree in chemical engineering from the University of Arkansas in Fayetteville, Arkansas.
Don’t just survive: Thrive with advanced process control
Environment & Safety
/ Process Control
/ Process Optimization
/ Construction
/ Engineering & Design
/ Equipment
/ Information Systems
/ Loss Prevention
There is a new adage in process manufacturing circles, and it resonates particularly deeply in the hydrocarbon industry: If you do not like market factors today, just wait a month.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ABB enhances AI capabilities of flagship industrial device digital solutions 4/17
- XCF, DevvStream, Southern Energy Renewables partner to bring transferable 45Z clean fuel credits to market 4/17
- HyOrc completes independent process and technology verification for waste-to-methanol platform 4/17
- Bottled lightning makes a cleaner fuel: Research shows how bursts of plasma convert methane into methanol without high heat and pressures 4/17
- Evonik launches high performance isodewaxing catalysts for fuels and lubricants production 4/16
- BASF to increase its price for neopentylglycol in the U.S. and Canada 4/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

