Aronen, R.
Amine pumps upgraded for improved operations and reliability
Asia/Pacific
/ Gas Processing/LNG
/ Maintenance & Reliability
/ Carbon Management
/ Economics
/ Engineering & Design
/ Loss Prevention
/ Pumps
/ Rotating Equipment
/ Safety
A gas processing plant in Malaysia eliminated a source of expensive failures in its acid gas removal unit (AGRU).
Improve pump reliability with advanced composite wear rings
The results were reduced vibration and seal leaks at this plant
Improving equipment reliability through e-learning
It will change the way people work, learn, communicate and solve problems
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Topsoe to support green ammonia flagship project in Saudi Arabia 1/27
- Asahi Kasei, Mitsui Chemicals and Mitsubishi Chemical establish entity for ethylene plant decarbonization 1/27
- Neste supports catalysis research at three universities in Finland 1/27
- Haffner Energy launches the C-iC modular units line to unlock financing for mid-sized biofuel projects 1/27
- Repsol to install second 100-MW electrolyzer at its Petronor refinery 1/27
- Toshiba and Airbus drive the future of hydrogen-powered flight with superconducting motors 1/27
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

