Aronen, R.
Amine pumps upgraded for improved operations and reliability
Asia/Pacific
/ Gas Processing/LNG
/ Maintenance & Reliability
/ Carbon Management
/ Economics
/ Engineering & Design
/ Loss Prevention
/ Pumps
/ Rotating Equipment
/ Safety
A gas processing plant in Malaysia eliminated a source of expensive failures in its acid gas removal unit (AGRU).
Improve pump reliability with advanced composite wear rings
The results were reduced vibration and seal leaks at this plant
Improving equipment reliability through e-learning
It will change the way people work, learn, communicate and solve problems
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Azerbaijan's State Oil Company redirects supplies of jet fuel from STAR refinery to Turkish domestic market 5/8
- Hungry to sell, UAE slips hidden oil tankers through Strait of Hormuz 5/8
- Seven markets to track if peace breaks out in the Middle East 5/8
- Asia exports of refined fuels plunge amid Hormuz closure 5/8
- Libya's Zawiya oil refinery shut due to nearby clashes 5/8
- Meghna PVC partners with Jotun to manage corrosion maintenance 5/7
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

