Choudary, N. V.
What are the corrosion issues for gasohol?
New study investigates metal deterioration from ethanol-blended gasoline
Reevaluate the activity of your catalyst system
Petrochemicals
/ Process Optimization
/ Refining
/ Americas
/ Asia/Pacific
/ Catalysts
/ Europe
/ Middle East
Selecting optimum conditions for fluid catalytic cracking requires micro activity testing through an improved method
Fine-tune catalyst addition rates
Simple method dynamically optimizes E-catalyst activity in fluid catalytic crackers
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Repsol and Bunge to boost development of renewable fuels in Europe with intermediate crops 5/2
- Repsol surpasses 1,000 service stations with 100% renewable Nexa Diesel 5/2
- Methanex announces the successful restart of 1.8-MMtpy Geismar 3 plant in Louisiana (U.S.) 5/2
- Digital Exclusive: From safety silos to strategic insights: Digitally transforming SIS management 5/2
- Norway's Mongstad oil refinery maintains operation during partial evacuation 5/2
- Canada's Imperial Oil posts rise in quarterly profit on stronger refining margins 5/2
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction