Bader, J.-M.
Case history: Sasol’s optimization of the catalyst regeneration process for C5 isomerization
Process Control
/ Process Optimization
/ Refining
/ Americas
/ Analyzers
/ Asia/Pacific
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Information Systems
/ Management
/ Middle East
Advanced process control (APC) offers solutions to use full catalyst regenerator capacity safely and to generate substantial benefits. Significant yield increases and operating cost reductions can be ..
Use a systematized approach of good practices in pygas hydrogenation via APC
APC with inferential modeling was successfully applied to pygas hydrogenation units. The lengthening of the catalyst run length limits downtime for both the pygas unit and upstream units such as the steam cracker.
Use real-time optimization for low-sulfur gasoline production
As the main sulfur source in the gasoline pool, fluid catalytic cracker (FCC) gasoline cuts must undergo severe hydrodesulfurization (HDS) processing to achieve ultra-low-sulfur gasoline (ULSG) pool s..
Increase MTBE plant productivity
Applying advanced process control solutions enabled raising unit output without a major retrofit of existing equipment
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Haldia Petrochemicals awards ethylene plant digitalization contract to Lummus 5/2
- INEOS completes purchase of LyondellBasell's EO&D facility in Bayport, Texas (U.S.) 5/2
- HPLNG delays commissioning of Chhara LNG import terminal in India 5/2
- Shell records nearly $8-B Q1 profit on the back of refining, chemicals/products and LNG divisions 5/2
- Water treatment specialist SurfCleaner supplies Norwegian energy giant Equinor 5/2
- U.S. White House: Russia shipping fuel to North Korea above UN cap 5/2
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction