Bader, J.-M.
Case history: Sasol’s optimization of the catalyst regeneration process for C5 isomerization
Process Control
/ Process Optimization
/ Refining
/ Americas
/ Analyzers
/ Asia/Pacific
/ Economics
/ Engineering & Design
/ Equipment
/ Europe
/ Information Systems
/ Management
/ Middle East
Advanced process control (APC) offers solutions to use full catalyst regenerator capacity safely and to generate substantial benefits. Significant yield increases and operating cost reductions can be ..
Use a systematized approach of good practices in pygas hydrogenation via APC
APC with inferential modeling was successfully applied to pygas hydrogenation units. The lengthening of the catalyst run length limits downtime for both the pygas unit and upstream units such as the steam cracker.
Use real-time optimization for low-sulfur gasoline production
As the main sulfur source in the gasoline pool, fluid catalytic cracker (FCC) gasoline cuts must undergo severe hydrodesulfurization (HDS) processing to achieve ultra-low-sulfur gasoline (ULSG) pool s..
Increase MTBE plant productivity
Applying advanced process control solutions enabled raising unit output without a major retrofit of existing equipment
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Dow Chemical delays construction on multi-billion-dollar Path2Zero project in Fort Saskatchewan, Alberta, Canada 4/25
- Asahi Kasei, Nobian, Furuya Metal and Mastermelt commence joint project to recycle metals, signaling a milestone towards circularity in the chlor-alkali industry 4/25
- India's Delhi plans to curb gasoline car sales, ban gas-guzzling bikes to shed polluter tag 4/25
- Automakers rush to meet surging China demand for long-range hybrids 4/25
- Aster Chemicals to bid for ExxonMobil's Singapore fuel stations 4/25
- Wärtsilä, Höegh Evi and partners complete development of world’s first floating ammonia-to-hydrogen cracker 4/25
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction