Sarwat, A
Adnan Sarwat has more than 25 yr of project and maintenance/turnaround experience in both the downstream and upstream sectors while mainly working in the Middle East with international oil companies. As a mechanical engineer, he has a passion for using his practical experience to train and mentor fellow and young engineers.
Arranging lines in a pipe rack: How to standardize pipe spacing in the oil and gas industry
This article provides deep insight to piping layout engineers, presenting a holistic/systematic approach for pipe spacing based on different pipe supports—e.g., rest, guide, shoe and clamps (rather than assuming spacing based on 50-mm or 75-mm clearance between pipes).
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- HIF Global selects Johnson Matthey’s methanol technology for the largest e-methanol plant in South America 5/16
- BASF expands its biomass balance portfolio for selected chemical intermediates 5/16
- INEOS Inovyn launches next-generation recycling pilot plants to strengthen Europe’s PVC recycling 5/16
- How Europe reduced its greenhouse gas emissions in 2023 5/16
- Plug signs contract with Allied Green Ammonia to supply H2 for planned ammonia facility in Australia 5/16
- HSBC to arrange funds for $1.49-B expansion project at Vietnam's Binh Son refinery 5/16
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction