Sarwat, A
Adnan Sarwat has more than 25 yr of project and maintenance/turnaround experience in both the downstream and upstream sectors while mainly working in the Middle East with international oil companies. As a mechanical engineer, he has a passion for using his practical experience to train and mentor fellow and young engineers.
Photography in the oil and gas industry: Its significance and best practices
Producing photographs of and within process plants requires special attention and discipline.
Arranging lines in a pipe rack: How to standardize pipe spacing in the oil and gas industry
This article provides deep insight to piping layout engineers, presenting a holistic/systematic approach for pipe spacing based on different pipe supports—e.g., rest, guide, shoe and clamps (rather than assuming spacing based on 50-mm or 75-mm clearance between pipes).
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Hanwha Ocean signs strategic MoU with Kanata Clean Power for proposed $15.7-B, 12-MMtpy FLNG project in Canada 6/18
- Burckhardt Compression secures milestone order for first industrial scale liquefied CO₂ carrier supporting Northern Lights CCS project 6/18
- Dynelectro dispatches 250-kW electrolyzer unit to Syntholene’s Iceland eSAF project 6/18
- EIA: U.S. crude inventories decline for tenth week to over 40-yr low 6/18
- Australia opens first carbon refinery, making new products from captured CO2 6/18
- ABB expands non-invasive sensing portfolio to advance simpler, safer temperature measurement 6/18
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

