Sarwat, A
Adnan Sarwat has more than 25 yr of project and maintenance/turnaround experience in both the downstream and upstream sectors while mainly working in the Middle East with international oil companies. As a mechanical engineer, he has a passion for using his practical experience to train and mentor fellow and young engineers.
Photography in the oil and gas industry: Its significance and best practices
Producing photographs of and within process plants requires special attention and discipline.
Arranging lines in a pipe rack: How to standardize pipe spacing in the oil and gas industry
This article provides deep insight to piping layout engineers, presenting a holistic/systematic approach for pipe spacing based on different pipe supports—e.g., rest, guide, shoe and clamps (rather than assuming spacing based on 50-mm or 75-mm clearance between pipes).
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Sherwin-Williams expands global core product offering for customers worldwide 3/18
- New insulation board containing expandable polystyrene-containing recycled material used in pilot project by ABG, BASF and Sto 3/18
- Venezuela's PDVSA to keep producing, exporting and processing oil previously handled by Chevron 3/18
- Green Plains breaks ground on carbon capture compression equipment, provides update on Clean Sugar Technologyâ„¢ 3/18
- Syntholene secures 20-MW energy agreement for geothermal-powered eSAF commercial demonstration facility 3/18
- Increase of ethanol mix in gasoline to 30% backed by tests, Brazil ministry says 3/18
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction