Sensors
Digital Feature: Enhancing ethylene cracker radiant tube integrity through innovative robotic inspection
Analyzers
/ Automation
/ Corrosion
/ Engineering & Design
/ Equipment
/ Environment & Safety
/ Ethylene
/ Furnaces
/ Heat Transfer
/ Loss Prevention
/ Instrumentation
/ Petrochemicals
/ Process Optimization
/ Safety
/ Sensors
Radiant tube failure ranks as a primary cause of unplanned shutdowns in ethylene cracking furnaces. This article examines tube failures via carburization, along with a proprietary technology that provides comprehensive multi-aspect inspection data to mitigate ethylene radiant tube failures.
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Dow Chemical delays construction on multi-billion-dollar Path2Zero project in Fort Saskatchewan, Alberta, Canada 4/25
- Asahi Kasei, Nobian, Furuya Metal and Mastermelt commence joint project to recycle metals, signaling a milestone towards circularity in the chlor-alkali industry 4/25
- India's Delhi plans to curb gasoline car sales, ban gas-guzzling bikes to shed polluter tag 4/25
- Automakers rush to meet surging China demand for long-range hybrids 4/25
- Aster Chemicals to bid for ExxonMobil's Singapore fuel stations 4/25
- Wärtsilä, Höegh Evi and partners complete development of world’s first floating ammonia-to-hydrogen cracker 4/25
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction