Project Management
Foster Wheeler to consult with Apache Khalda on Egypt gas compression
Foster Wheeler will assist Apache Khalda in the management and administration of the EPC phase of the project as part of a joint project management team. The EPC phase is expected to be completed in the first quarter of 2015. Financial terms of the deal were not disclosed.
Shale energy resources driving resurgence for ethylene industry
The abundant supply of North American shale energy resources is proving to be not only a boon for exploration and production (E&P) companies and energy consumers, but it is also changing the profitabi..
North American olefin producers riding the shale gas wave
With the prospect of abundant low-cost ethane, several producers have announced intentions to build new ethylene capacity.
High-pressure polyethylene: Reemergence as a specialty chemical or not?
The analysis results indicate that, while investment capital for new plants favors LLDPE, plant profitability—which is a function of product slate (revenue) and cost—is, in many cases, higher for LDPE plants.
HPI Focus: New vs. debottlenecking projects
As most owners do not have adequately skilled engineering teams to study these scenarios, engaging an experienced, qualified engineering contractor to support the conceptual study is often warranted.
HP Boxscore Construction Analysis: Ethylene in evolution: 50 years of changing markets and economics
Ethylene is the key building block for the petrochemical industry. This olefin supports 70% of petrochemical industry production and is used to manufacture a wide variety of products for industrial an..
HP Brief
LyondellBasell plans to expand North American ethylene capacityLyondellBasell will raise its ethylene capacity in North America by 18% in coming years through several debottlenecking projects. Locatio..
HP Industry Perspectives: Are Arctic projects safe?
Key industry officials answer a poll question from HydrocarbonProcessing.com
Overcome barriers to proper planning and scheduling
Planning and scheduling must work hand-in-hand for a turnaround, outage or shutdown to be executed to budget and schedule. Unless proper diligence is given up-front to planning and scheduling, no amou..
Valero awards engineering pact to Foster Wheeler for Pembroke refinery in UK
Foster Wheeler will provide home office front-end engineering design and detailed engineering design services to support new development and modification projects at the Pembroke refinery and other UK facilities. Terms were not disclosed. Valero acquired the Pembroke refinery in 2011.
- OMV receives €450-MM loan from the European Investment Bank for its 140-MW green hydrogen production facility 7/13
- Poland's Unimot says it will supply crude to Germany's Schwedt refinery 7/13
- Hormuz traffic slows to two-month low as renewed U.S., Iran strikes raise safety risk 7/13
- Sinopec deepens aviation fuel push with CNAF restructuring 7/13
- Indian naphtha premiums surge as Gulf, Russian supply tightens 7/13
- Less than a month's supply: Europe's jet fuel stocks are wafer thin as Iran tensions flare 7/13

