Environment & Safety Gas Processing/LNG Maintenance & Reliability Petrochemicals Process Control Process Optimization Project Management Refining

Process Optimization

Petrobras signs contract for new units at Refap

Petrobras signed today a contract for the construction of the new diesel hydrotreating unit (HDT II) and the new hydrogen generation unit (UGH II) at the Alberto Pasqualini refinery (Refap) in Canoas, Rio Grande do Sul, Brazil.

Kentz helping get Qatar’s Pearl GTL plant in shape

Kentz Corp. Ltd. has been enlisted to assist in executing plant change requests for Qatar Shell GTL Ltd. Kentz will provide engineering design, construction supervision and procurement services for plant changes and projects at the Pearl gas to liquids (GTL) plant in Ras Laffan Industrial City, Qatar.

When is CO2 more hazardous than H2S

Trimeric Corp.: Beitler, C. M.  |  Fisher, K.  |  McIntush, K.  |  Lundeen, J.
Pastor, Behling & Wheeler LLC: Tyndall, K.

Data shows potential harmful effects to workers due to acid gas exposure

Consider different alternatives for enriching lean acid gases

Ministry of Science, Research and Technology, Semnan University: ZareNezhad, B.

New developments improve operation of Claus sulfur recovery units

Case 60: Socket-weld failures

Consulting Engineer: Sofronas, A.

A risk analysis can determine which critical welds to repair

What are the strategies for sustainable chemical production?

Special Secretary to Government of Kerala, and Chairman, Chemical Engineering Division Board of the Institution of Engineers: Nair, M. P. Sukumaran

New environmental challenges require a new way of thinking by the hydrocarbon processing industry

Considerations for blast-resistant electrical equipment centers

Lectrus Corp.: Cole, D.  |  Austin, D.

Guidelines explore protecting critical systems from disaster

Going ‘green’ with FCC expander technology

GE Oil & Gas: Carbonetto, B.  |  Pecchi, P.

New options recover waste gas energy as steam and electricity for plant use

HP Control: Process control practice renewal—select CVs

Clifftent Inc.: Latour, P. R.

I followed my April 2010 call for renewal of process control and IT practice with editorials on purpose in August, performance in October and consequences in December. Now I turn to selection of contr..

HP Reliability: Packing not best practice for firewater pumps

Hydrocarbon Processing Staff: Bloch, Heinz P.

Statistics show that for every 1,000 pump failures in hydrocarbon processing plants, there will be a fire. Fig. 1 shows a typical visible outcome, and the final bill for remedying such disastrous resu..