Avoid failures with pump power-end upgrades
Designing-out maintenance and failure risk starts with simple upgrading measures, culminates in re-thinking entire bearing housing configuration
Consider life-cycle costs in specifying control valves
Latest approach improves sizing valves while also incorporating total ownership investment
Use a new calibration method for gas pipelines
An advanced method improves calibrating orifice flowmeters while reducing maintenance costs
Decrease vibration in piping with reciprocating compressors
Case study identifies problems in new compression unit
HP Reliability: Reliability pros: Hear what others say about you
In an editorial “Engineering Better Engineers,” published in the January 2010 issue of Civil Engineering News, John Bachner commented on how lack of innovation has resulted in engineering se..
Rethink lubrication and steam issues on emergency equipment
‘Best available technology’ is a must for backup systems
Case 63: Analyzing off resonance amplitudes
It is important to know the amplitudes of vibration away from resonance
HP Reliability: Pump switching: What is the best practice?
From a recent sequence of correspondence, we discern that certain rulings were being made years ago, although the rationale used to make these rulings has not been explained. This example involves a r..
Prevent fouling in 1-butene storage vessels
Investigation finds root cause for polymer formation in Horton spheres
Wood Group wins $15mn deal for gas turbine maintenance in Argentina
Wood Group GTS has signed a six-year contract with PlusPetrol Energy S.A to provide maintenance services for two General Electric Frame 9E DLN-1 gas turbines at the Central Termica San Miguel de Tucuman power plant in El Bracho, Argentina.
- Ebara Elliott Energy awarded landmark order from Kawasaki Heavy Industries to advance global liquefied hydrogen supply chain 4/24
- Digital Exclusive: Early collaboration with vendors: Mitigating design risk and ensuring successful project execution 4/24
- Pacífico Mexinol celebrates groundbreaking of $3.3-B clean fuels complex 4/24
- Brazil to start tests for diesel blend containing 20% biofuel in May 4/24
- ATOME announces FID for $665-MM green hydrogen project in Paraguay 4/24
- U.S.: Trump grants 90-day Jones Act waiver extension to curb energy costs 4/24