Heat Exchanger
Design considerations and decarbonization options for fired heaters
Environment & Safety
/ Gas Processing/LNG
/ Process Optimization
/ Project Management
/ Refining
/ Analyzers
/ Carbon Management
/ Catalysts
/ Construction
/ Corrosion
/ Engineering & Design
/ Equipment
/ Furnaces
/ Greenhouse Gases
/ Heat Exchanger
/ Hydrogen
/ Natural Gas
As greenhouse gas emissions policies and regulations become more stringent, carbon dioxide emissions have taken center stage, with many nations targeting net-zero carbon emissions.
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Topsoe fuels China’s push for sustainable aviation fuel: Selected as technology provider for major project 1/23
- Europe set for record LNG imports in 2026 1/23
- Plug Power completes installation of 100-MW GenEco electrolyzer units at Galp’s Sines refinery 1/23
- Reju announces site selection for first U.S. industrial-sized facility regeneration hub 1/23
- Engineering a low-cost alternative catalyst for producing sustainable petrochemicals 1/23
- New report identifies methanol-to-jet as a key accelerator of the next wave of sustainable aviation fuel 1/23
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

