Foster Wheeler to install heat exchangers at Linde gases plant in England
6/23/2014 12:00:00 AM
Foster Wheeler has signed an engineering, procurement and construction management (EPCm) services agreement with BOC, a member of The Linde Group, for the installation of replacement heat exchangers at BOCs Teesport facility in northeast England.
The Foster Wheeler contract value was not disclosed and was included in the companys first-quarter 2014 bookings.
Under this agreement, Foster Wheeler will provide project management, front-end engineering design, detailed engineering design, procurement services, construction supervision and quality assurance for the replacement of existing aluminium plate fin exchangers in the 1,300 tpd air separation plant.
Installation is scheduled for completion in the fourth quarter of 2014.
The Teesport facility provides oxygen and other gases to industrial facilities in the region.
Related News
- ABB enhances AI capabilities of flagship industrial device digital solutions
- HyOrc completes independent process and technology verification for waste-to-methanol platform
- Bottled lightning makes a cleaner fuel: Research shows how bursts of plasma convert methane into methanol without high heat and pressures


Comments