October 2021
Columns
Engineering Case Histories: Case 114: A local flooding event at a plant site
During a heavy rainstorm, flooding occurred at a plant location that had never before flooded.
This is a preview of our premium content. Thank you for your interest—please log in or subscribe to read the full article.
The Author
Related Articles
- Capital efficient ethane cracking: Quantifying the tradeoffs between full recovery and streamlined configurations
- First-stage ejector nozzle retrofit achieves meaningful performance improvement
- A three-party approach to maximizing propylene through operational excellence, innovative catalysts and hardware design


Comments