November 2010
Columns
HP Reliability: Wire mesh vs. wire size for temporary strainers
Even an experienced reliability professional may find some customary terminology dealing with wire gauge and wire mesh to be confusing. Our HPIn Reliability column of April 2009 mentioned pump suction..
This is a preview of our premium content. Thank you for your interest—please log in or subscribe to read the full article.
The Author
Related Articles
- Capital efficient ethane cracking: Quantifying the tradeoffs between full recovery and streamlined configurations
- Antifoam performance in MDEA systems: Implications for cost-efficient solutions
- A three-party approach to maximizing propylene through operational excellence, innovative catalysts and hardware design


Comments