Khan, M. S.
Lessons learned from a refinery revamp project
Revamp projects are inherently challenging due to the numerous constraints imposed by existing equipment design and space limitations.
Take a quicker approach to staggered blowdown
Environment & Safety
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Construction
/ Engineering & Design
/ Equipment
/ Europe
/ Loss Prevention
/ Middle East
/ Piping
/ Reactors
/ Safety
/ Valves
The design of a reliable blowdown system for a large sour gas-processing facility is one of the most important aspects of plant design. Safe design is vital for facility operation. With the developmen..
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Hydrocarbon Processing launches AI platform to accelerate decisions in the downstream sector 7/7
- Digital Feature: The critical interdependency of relief valve analysis and flare system considerations during HAZOP 7/7
- Trafigura to use Babcock's ammonia fuel supply system onboard gas carriers 7/7
- Lotte Chemical Titan secures $3-B ethylene supply deal in Indonesia 7/7
- Diesel East-West price spread nears 1.5-yr high amid supply concerns West, stable East 7/7
- U.S. Gulf Coast fuel oil imports at record low as refiners opt for heavier crude 7/7
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction