Khan, M. S.
Lessons learned from a refinery revamp project
Revamp projects are inherently challenging due to the numerous constraints imposed by existing equipment design and space limitations.
Take a quicker approach to staggered blowdown
Environment & Safety
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Construction
/ Engineering & Design
/ Equipment
/ Europe
/ Loss Prevention
/ Middle East
/ Piping
/ Reactors
/ Safety
/ Valves
The design of a reliable blowdown system for a large sour gas-processing facility is one of the most important aspects of plant design. Safe design is vital for facility operation. With the developmen..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- YPF, Eni and XRG sign joint development agreement advancing 12-MMtpy Argentina LNG project 2/12
- Maire launches new technology to produce PTMEG, the key polymer composing the spandex fiber. 2/12
- Verde Clean Fuels announces suspension of development of Permian Basin gas-to-gasoline project 2/12
- Vietnam's largest refinery to operate at 120%-125% of designed capacity in Q1 2/12
- Indonesia's Medco expansion plans bet on rising energy demand in Southeast Asia 2/12
- Brazil to rebuild ethanol stocks in new harvest after 21% drop in 2025-2026 2/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

