Khan, M. S.
Lessons learned from a refinery revamp project
Revamp projects are inherently challenging due to the numerous constraints imposed by existing equipment design and space limitations.
Take a quicker approach to staggered blowdown
Environment & Safety
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Construction
/ Engineering & Design
/ Equipment
/ Europe
/ Loss Prevention
/ Middle East
/ Piping
/ Reactors
/ Safety
/ Valves
The design of a reliable blowdown system for a large sour gas-processing facility is one of the most important aspects of plant design. Safe design is vital for facility operation. With the developmen..
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- TA’ZIZ awards $1.99-B EPC contract to build one of the world’s largest PVC complexes 11/5
- Borouge launches first "Made-in-UAE" low-density polyethylene for medical applications 11/5
- MOL Group urges Europe to unite behind a new industrial agenda 11/5
- Synergen selects Topsoe's dynamic ammonia loop technology for 210,000-tpy green ammonia plant 11/5
- Blue Circle Olefins secures funding/site for 100% circular olefins production facility 11/5
- Carbon Clean and SAMSUNG E&A to accelerate global deployment of carbon capture solutions 11/5
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

