Khan, M. S.
Lessons learned from a refinery revamp project
Revamp projects are inherently challenging due to the numerous constraints imposed by existing equipment design and space limitations.
Take a quicker approach to staggered blowdown
Environment & Safety
/ Process Optimization
/ Americas
/ Asia/Pacific
/ Construction
/ Engineering & Design
/ Equipment
/ Europe
/ Loss Prevention
/ Middle East
/ Piping
/ Reactors
/ Safety
/ Valves
The design of a reliable blowdown system for a large sour gas-processing facility is one of the most important aspects of plant design. Safe design is vital for facility operation. With the developmen..
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Rönesans Holding closes financing on $2-B PP production plant in Türkiye 4/17
- Saneg launches a company to develop business in the aviation fuel segment 4/17
- More than 100 employees leave U.S. EIA, putting crucial energy data at risk 4/17
- Russia ramps up oil products supplies to Indonesia 4/17
- India eyes ending import tax on U.S. ethane and LPG in trade talks 4/17
- Russia's diesel output to rise in May despite seasonal maintenance 4/17
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction