Dey, P. K.
Integrated approach to materials management: a case study
Business process re-engineering provided a substantial improvement to this function
Integrated approach to materials management: a case study Table 3
  Table 3. Total improvement   ..
Quantitative risk management aids refinery construction
Combining the Analytic Hierarchy Process and decision tree analysis provides an effective means for controlling a complex project
Project management system for a concurrent engineering framework
Case study of a project in India demonstrates how a planning structure was applied to complete the job on a fast track
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- Topsoe to support green ammonia flagship project in Saudi Arabia 1/27
- Asahi Kasei, Mitsui Chemicals and Mitsubishi Chemical establish entity for ethylene plant decarbonization 1/27
- Neste supports catalysis research at three universities in Finland 1/27
- Haffner Energy launches the C-iC modular units line to unlock financing for mid-sized biofuel projects 1/27
- Repsol to install second 100-MW electrolyzer at its Petronor refinery 1/27
- Toshiba and Airbus drive the future of hydrogen-powered flight with superconducting motors 1/27
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

