Dey, P. K.
Integrated approach to materials management: a case study
Business process re-engineering provided a substantial improvement to this function
Integrated approach to materials management: a case study Table 3
  Table 3. Total improvement   ..
Quantitative risk management aids refinery construction
Combining the Analytic Hierarchy Process and decision tree analysis provides an effective means for controlling a complex project
Project management system for a concurrent engineering framework
Case study of a project in India demonstrates how a planning structure was applied to complete the job on a fast track
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ITT to acquire SPX Flow for > $4.77 B, expanding leadership in highly engineered components and adjacent flow technologies 12/5
- MOL Group introduces eco-friendly Bag-in-Box packaging for lubricants 12/5
- Addis Energy secures $8.3 MM to scale its transformative approach to low-cost ammonia production 12/5
- World Fuel Services supplies cruise line with waste-based biofuels 12/5
- Chevron announced $18 B-$19-B CAPEX budget for 2026 12/5
- Russia and India sign deal to build urea plant in Russia 12/5
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

