Dey, P. K.
Integrated approach to materials management: a case study
Business process re-engineering provided a substantial improvement to this function
Integrated approach to materials management: a case study Table 3
  Table 3. Total improvement   ..
Quantitative risk management aids refinery construction
Combining the Analytic Hierarchy Process and decision tree analysis provides an effective means for controlling a complex project
Project management system for a concurrent engineering framework
Case study of a project in India demonstrates how a planning structure was applied to complete the job on a fast track
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- BASF supports European 1,4‑butanediol supply security through increased production in Ludwigshafen 2/16
- Vitol backs proposed $3-billion LNG power plant for South Africa's Durban port 2/16
- HAMR Energy receives additional funding for low-carbon liquid fuels projects 2/16
- Suffocating Western pressure may finally force Russian oil output cuts 2/16
- SkyNRG starts construction on its first SAF plant in Delfzijl, the Netherlands 2/13
- India's Reliance wins U.S. license for Venezuelan oil 2/13
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

