Goti, A.
Optimize reordering of critical raw materials and parts
New models evaluate the ‘total’ costs in receiving and storing materials for a refinery
Managing costs and incidents in industrial plant equipment
Use this method to allogate limited maintenance resources to the most critical equipment
Sound-based predictive maintenance: a cost-effective approach
An electronic stethoscope, digital recorder and computer program can detect and diagnose many incipient equipment failures
Optimizing preventive maintenance by combining discrete event simulation and genetic algorithms
Cost and benefit criteria are applied to a multi-equipment system
Multiobjective genetic algorithms optimize maintenance
Overall equipment effectiveness and cost criteria are considered
Money-based overall equipment effectiveness
Use this method to identify, prioritize and quantify inefficiencies
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Ningbo Refining & Chemical awards ECI a technology licensing contract for an EVA/LDPE plant in China 4/30
- Fitesa to use Braskem's I'm green bio-based polyethylene grade for nonwovens 4/30
- SIBUR preparing to produce heat-resistant polyethylene in Kazan 4/30
- Aemetis to benefit from the U.S. EPA’s approval of 15% ethanol blend 4/30
- Biofuel maker Neste expects limited impact from tariffs, but supply glut still weighs 4/30
- Portugal's Galp restarting Sines oil refinery over coming days 4/30
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction