Vance, A. E.
Austyn E. Vance is a Process Engineer at Trimeric Corp. with 8 yr of process engineering experience on a variety of projects. She has assisted clients with relief valve specification, inlet/outlet pipe sizing and relief scenario analysis. Ms. Vance graduated with a BS degree in chemical engineering from the University of Tulsa in Oklahoma.
Solve PRV and piping capacity problems—Part 2
Engineers often uncover problems or inadequacies with pressure relief valve (PRV) and relief system piping capacities that need creative and cost-effective solutions.
Solve PRV and piping capacity problems—Part 1
Engineers often uncover problems or inadequacies with pressure relief valve (PRV) and relief system piping capacities that need creative and cost-effective solutions.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ExxonMobil plans 1 Blbs/yr of advanced recycling by 2027 11/22
- Gauging the likely Trump effect on U.S. energy and power sectors 11/22
- Russia's Lukoil restoring cracker at NORSI refinery, gasoline output rising 11/22
- Nigeria's local currency crude sales fall short of target, Dangote refinery says 11/22
- U.S. October gasoline imports hit post-pandemic low on slump in European shipments 11/22
- Clean Hydrogen Works awards McDermott FEED contract for Ascension Clean Energy (ACE) project 11/21
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction