Harrison, P.
Peter Harrison graduated from Loughborough University in the UK in 2009 with an MS degree in chemical engineering. He has worked in APC since 2011, and is now leading the deployment and continual improvement of APC applications at Total’s Lindsey refinery in the UK.
Advanced process control of debutanizers makes use of inferential predictions
Following good experience with a generalized cut-point calculation (GCC) inferential package, which models main fractionators with side streams, French energy major Total decided to experiment with a generalized distillation shortcut (GDS) inferential package, which models simpler, two-product distillation columns.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- YPF, Eni and XRG sign joint development agreement advancing 12-MMtpy Argentina LNG project 2/12
- Maire launches new technology to produce PTMEG, the key polymer composing the spandex fiber. 2/12
- Verde Clean Fuels announces suspension of development of Permian Basin gas-to-gasoline project 2/12
- Vietnam's largest refinery to operate at 120%-125% of designed capacity in Q1 2/12
- Indonesia's Medco expansion plans bet on rising energy demand in Southeast Asia 2/12
- Brazil to rebuild ethanol stocks in new harvest after 21% drop in 2025-2026 2/12
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction

