Street, M.
New residue-upgrading complex achieves Euro 5 specifications
Environment & Safety
/ Process Optimization
/ Project Management
/ Refining
/ Americas
/ Aromatics
/ Asia/Pacific
/ Biofuels
/ Carbon Management
/ Catalysts
/ Compressors
/ Construction
/ Crude oil
/ Desulfurization
/ Diesel
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Gasification
/ Gasoline
/ Hydrocracking
/ Hydrogen
/ Hydrotreating
/ Loss Prevention
/ Management
/ Middle East
/ Naphtha
/ Octane
/ Reactors
/ Safety
In late 2010, Grupa LOTOS SA completed construction of a major residue-upgrading project at its refinery in Gdańsk, Poland. Its 10+ Program was designed to unlock a step change in the facility’s long-term profitability. After two years of operating, this project has had a profound effect on the refinery’s economics.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Borouge to develop AI-powered autonomous UAE operations to accelerate growth and value creation 6/25
- Ch0C gas boiler: A French consortium innovates for industrial decarbonization 6/25
- Taiwanese container ship operator to install WinGD's methanol engines across more than 30 vessels 6/25
- EIA: U.S. crude and fuel inventories fall on higher demand 6/25
- Update: Venezuela's second largest refinery restarting units after blackout 6/25
- 3t introduces landmark training to empower women in Saudi Arabia’s energy sector 6/25
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction