Ozmen, S. M.
HP Viewpoint: The journey to a value-adding refinery project
It is quite common for a project to become fully operational 4–5 years after its initial definition, during which time the prevailing market conditions are likely to have shifted.
HP Viewpoint: Age of turbulence: Charting the refining course toward a profitable future
Environment & Safety
/ Petrochemicals
/ Process Optimization
/ Refining
/ Acid Gas Removal
/ Alcohols
/ Americas
/ Aromatics
/ Asia/Pacific
/ Biofuels
/ Carbon Management
/ Catalysts
/ Cetane
/ Construction
/ Crude oil
/ Desulfurization
/ Diesel
/ Distillation
/ Economics
/ Engineering & Design
/ Environment
/ Equipment
/ Europe
/ Gasoline
/ Greenhouse Gases
/ Loss Prevention
/ Management
/ Middle East
/ Naphtha
/ Natural Gas
/ Octane
/ Polymers
/ Reactors
/ Safety
High-performing enterprises draw on external expertise during all project phases, from scouting and front-end engineering and development through to operations.
- 1
- ... 1 pages
Current Digital Edition

Sign up to Receive Our Newsletter
Latest News
- Hunt Refining's Tuscaloosa refinery (U.S.) expedites maintenance, repairs on fire-damaged coker unit 5/23
- SIBUR-Sinopec's Amur GCC expects to produce first polyethylene in Q3 2026 5/23
- Phillips 66's Los Angeles (U.S.) refinery layoffs to begin in December, sources say 5/23
- Nigeria's Dangote refinery agrees to export polypropylene with Vinmar 5/23
- ExxonMobil Joliet refinery (U.S.) running unit at reduced rate 5/23
- Suncor reports flare replacement project at the Montreal refinery in coming weeks 5/23
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction