Talukder, R.
Rajib Talukder is a Process Specialist in the Global Manufacturing Excellence department at Aramco, Saudi Arabia. He has more than 30 yr of experience in process engineering and earned a BTech degree in chemical engineering from NIT Tiruchirappalli, India.
Demystify warm-up practices for centrifugal pumps
Crude oil
/ Desulfurization
/ Engineering & Design
/ Environment
/ Environment & Safety
/ Equipment
/ Loss Prevention
/ Maintenance & Reliability
/ Process Optimization
/ Refining
/ Pumps
/ Valves
This article provides a thorough analysis of various warm-up practices—examining their benefits and drawbacks and proposing well-grounded guidelines for the development of efficient warm-up systems.
- 1
- ... 1 pages
Current Digital Edition
Sign up to Receive Our Newsletter
Latest News
- ADNOC, AIQ developing first-of-a-kind agentic AI solution for global energy transformation 11/4
- SEEC to use thyssenkrupp nucera’s electrolyzer for caustic soda production 11/4
- Oman's OQ to list up to 49% stake in methanol, ammonia and LPG arm 11/4
- U.S. exports of ethane and ethane-based petrochemicals rose 135% from 2014 to 2023 11/4
- Cannon Artes breaks ground on massive industrial wastewater treatment/water reuse plant in Qatar 11/4
- LyondellBasell to close Houston refinery (U.S.) in Q1 2025 11/4
Construction Boxscore: Project Spotlight
Project:
Long Son Petrochemicals Complex
Location:
Long Son, Vietnam
Operator:
Siam Cement Group
Cost:
$5.4 B
Capacity:
1.65 MMtpy
Completion date:
2023
Status:
Under Construction